Skip to main contentSkip to footer
  • Tech Support
Home page for TrueGridHome page for TrueGrid
    • Licensing
    • Export
    • Import
    • Availability
    • FAQs
    • Manuals
    • Projection Method
    • Multi-Block Structure
    • Pre-Processing
    • Parametric & Scripting
    • Eliminate Clean-Up
    • Geometry Library
    • Modification Simplicity
    • Application Versatility
    • Tech Support
    • Validation and Verification
    • Biomechanical
    • World Trade Center
    • Finite Element Analysis
    • Crash Worthiness
    • Shape Optimization and Parametric Modeling
    • Hydrodynamics
    • Electrodynamics
    • Fluids and Structures
    • Computational Fluid Dynamics
    • Monte Carlo Methods
  • Academic Grant
  • Get Trial License
    • Licensing
    • Export
    • Import
    • Availability
    • FAQs
    • Manuals
    • Projection Method
    • Multi-Block Structure
    • Pre-Processing
    • Parametric & Scripting
    • Eliminate Clean-Up
    • Geometry Library
    • Modification Simplicity
    • Application Versatility
    • Tech Support
    • Validation and Verification
    • Biomechanical
    • World Trade Center
    • Finite Element Analysis
    • Crash Worthiness
    • Shape Optimization and Parametric Modeling
    • Hydrodynamics
    • Electrodynamics
    • Fluids and Structures
    • Computational Fluid Dynamics
    • Monte Carlo Methods
  • Academic Grant
  • Get Trial License

Finite Element Analysis

Home/Publications/Finite Element Analysis
Back to Publications
Publications
  • Biomechanical
  • Computational Fluid Dynamics
  • Crash Worthiness
  • Electrodynamics
  • Finite Element Analysis
  • Fluids and Structures
  • Hydrodynamics
  • Monte Carlo Methods
  • Shape Optimization and Parametric Modeling
  • Validation and Verification
  • World Trade Center
Disposal Systems Evaluations & Tool development-Engineered Barrier System (EBS) Evaluation

Disposal Systems Evaluations & Tool development-Engineered Barrier System (EBS) Evaluation

This technical report describes the use of finite element analysis and other advanced modeling techniques to evaluate designs for engineered barrier systems for nuclear waste disposal. The work focuses on simulating complex thermal, hydrological, mechanical, and chemical processes to predict the long-term performance and stability of these systems.

read more
Disposal System Evaluation Framework (DSEF) Version 1.0 - Progress Report

Disposal System Evaluation Framework (DSEF) Version 1.0 - Progress Report

The paper outlines the development of a framework for designing and evaluating nuclear waste repositories, using finite element analysis to perform complex thermal simulations. It validates this approach by comparing a finite element model's results to an analytical solution, demonstrating the model's viability for analyzing repository designs.

read more
Modelling of Failure in High Strength Steel Sheets

Modelling of Failure in High Strength Steel Sheets

Oscar Björkland

This paper explores the use of finite element analysis to model and predict failure in high-strength steel sheets. It combines mechanical testing with FE simulations to calibrate constitutive and failure models, demonstrating the importance of computational tools in material science research.

read more
Bow of a Barge during Its Headon Impact with a Bullnose or Cellular Structure

Bow of a Barge during Its Headon Impact with a Bullnose or Cellular Structure

Robert M. Ebeling and Terry W. Warren

The paper uses nonlinear finite element analysis to simulate head-on impacts of a barge bow with rigid structures, predicting the "capping force" caused by the yielding and buckling of the barge's plates and frame. This research demonstrates how FEA can model complex structural dynamics to understand the limiting forces in a collision.

read more
Finite element modeling of laser forming

Finite element modeling of laser forming

September 11, 2025//Yung-Chin Hsiao, Hideki Shimizu, Lee Firth, Warren
read more
Prev
1
…
1011121314
…
20
Next
Contact Us

Interested in learning more? Just saying hi? Drop us a line here!

TrueGrid
1141 Catalina Dr. #212, Livermore, CA 94550
(925) 349-6318
  • Product Info
    • Licensing
    • Export
  • Legal
    • Business Accounting
    • Trademark
Social
© 2026 XYZ Scientific Applications, Inc.
  • Copyright
Loading